Great Hall Lighting Rig and Associated Services

Award

Value

£0

Suppliers

Classifications

  • Repair and maintenance services of audio-visual and optical equipment
  • Lighting equipment and electric lamps
  • Lighting systems
  • Platforms lighting
  • Theatre construction work
  • Repair and maintenance services of audio equipment
  • Repair and maintenance services of optical equipment
  • Repair and maintenance services of cinematographic equipment
  • Installation services of sound equipment
  • Dance and performance entertainment services

Tags

  • award
  • contract

Published

1 year ago

Description

Lease and maintenance of a Lighting Rig and the associated supporting services to run the rig for a varied range of events (concerts/stand up comedy/orchestral performances etc.)
It is anticipated that the project will be divided into four distinct areas of work:
1)	Installation of temporary rental equipment for routine event operation
2)	 Installation of temporary rental equipment for specialised event operation
3)	 Ongoing hire and maintenance of temporary rental technical equipment
4)	 Management of the supply of technical services and crew

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

LJMU - Redmonds Building - VRV and LED Replacement Scheme

The scheme aims to upgrade the existing VRV system and lighting throughout the Redmonds Building. All works are detailed on the tender drawings, specification and in the schedule of works. The Tender documentation has been developed up to RIBA Stage 4 as outlined in the BSRIA Building Services Design Framework BG6. The Contractor shall provide coordination drawings, installation/fabrication drawings and technical submittals to further develop the design up to RIBA Stage 5. The works are scheduled to take place over the non-teaching season, with one floor closed off to staff at a time, for works to progress. The rest of the building will be occupied for the duration of the proposed construction programme and light replacement works will need to be undertaken in part on an out of hours basis (early evenings/weekends). The plan is to commence the works within the building from the top floor down over two years. The fifth, fourth and third floors will be in phase 1. The second, first, ground and lower ground floors will be within phase two. The lighting replacement will target the VRV replacement working areas in normal working hours, however other targeted areas will be completed 'out of hours', such as staff offices. The areas and programme are to be agreed at pre-start with the successful contractor. Contractor's will need to provide a breakdown of costs, per floor, as part of their tender submission. It is envisaged that on site welfare facilities will be available for use throughout the duration of the contract. NOTE: WORKS WILL NEED TO BE PHASED DUE TO THE AREAS BEING OCCUPIED AT THE TIME OF THE PROPOSED WORKS BEING UNDERTAKEN. Additional information: Please do not make direct contact the Buyer - all queries must be submitted via https://in-tendhost.co.uk/ljmu/aspx/Home We cannot guarantee we will respond to direct emails

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline cancelled

Publish
Bid
Evaluate
Award
Complete