CT093 - Major Adaptations works to properties for people with disability

Award

Value

£0

Suppliers

Classifications

  • Construction work
  • Building construction work
  • Refurbishment work
  • Construction work for subsidised residential accommodation
  • Construction work for multi-dwelling buildings and individual houses

Tags

  • award
  • contract

Published

2 years ago

Description

The Housing Executive wishes to procure suitably qualified and competent contractors to carry out works in relation to the provision of Major Adaptations for Persons with a Disability throughout Northern Ireland. It is proposed to have 6 Lots consisting of 3 Contractors each awarded a Contract (subject to a sufficient number of compliant tenders being received) covering 6 areas as detailed in the Tender documents. Subject to terms and conditions each Lot Contract will be for a period of 2 years + option to extend for two further periods of 12 months +12 months (or part thereof). A Tenderer can only be awarded one Contract in any of the 6 Lots, with a further restriction that overall they can only be awarded a maximum of THREE Contracts. Tenderers will be assessed on a “most economically advantageous tender” basis, according to price (100 marks).

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Headquarters Dog Section Refurbishment 2025

Cumbria Constabulary require a refurbishment scheme to upgrade their existing dog kennels and attached buildings at their Carleton Hall, Penrith, Headquarters site. The current unit was constructed circa 1960 and comprises office accommodation, storage rooms, kitchen, welfare and 15 no. dog kennels. There is a generous grassed area externally which is used to exercise the dogs. Within the exercise area is a timber, freestanding kennel on a concrete slab. The site is enclosed by a chain-link fence. Construction is typical of that era with concrete block external walls, suspended ceilings, solid internal walls and a concrete floor slab. The kennels have a profiled sheet roof covering believed to be asbestos with the office accommodation having a bitumen felt flat roof. Windows are timber framed. A condition survey has revealed extensive defects and issues with the building fabric. The current condition of the kennels has also raised concerns around dog welfare due to their dilapidated condition. Due to the above, an urgent refurbishment project is required to bring the kennels up to the welfare standards. A light touch refurbishment scheme to the offices will be included, but the works will predominately be around the construction of the new kennels. There is known Asbestos Containing Material within the building. An R&D survey has been carried out which is included for your reference. The Asbestos Management survey is also included. Any asbestos removal should be included as part of the works. Demolition of the existing 15 kennels to allow for the construction of 13 new kennels. The footprint of the building cannot be increased; therefore, the total number of kennels is to be reduced to increase the size of 5 kennels to accommodate the large breed dogs. A detached, double quarantine kennel is to be constructed to replace the freestanding timber kennel which currently sits on the concrete slab. Some remedial works may be required to the concrete slab. The kennels will be a basic construction comprising concrete block with composite, insulated roof panels. An internal hatch will separate the run from the sleeping area which can be closed off using a mechanical pulley operated both internally and externally. A new dog wash is to be constructed with access gained from a new corridor and door opening within the attached building. An ecology survey has identified roosting bats to the flat roof of the main building. Therefore, the flat roof is to receive ad-hoc bitumen repairs.

Katy Reed

Published 1 day ago
Open

Headquarters Dog Section Refurbishment 2025

4.1 Cumbria Constabulary require a refurbishment scheme to upgrade their existing dog kennels and attached buildings at their Carleton Hall, Penrith, Headquarters site. The current unit was constructed circa 1960 and comprises office accommodation, storage rooms, kitchen, welfare and 15 no. dog kennels. There is a generous grassed area externally which is used to exercise the dogs. Within the exercise area is a timber, freestanding kennel on a concrete slab. The site is enclosed by a chain-link fence. Construction is typical of that era with concrete block external walls, suspended ceilings, solid internal walls and a concrete floor slab. The kennels have a profiled sheet roof covering believed to be asbestos with the office accommodation having a bitumen felt flat roof. Windows are timber framed. A condition survey has revealed extensive defects and issues with the building fabric. The current condition of the kennels has also raised concerns around dog welfare due to their dilapidated condition. Due to the above, an urgent refurbishment project is required to bring the kennels up to the welfare standards. A light touch refurbishment scheme to the offices will be included, but the works will predominately be around the construction of the new kennels. There is known Asbestos Containing Material within the building. An R&D survey has been carried out which is included for your reference. The Asbestos Management survey is also included. Any asbestos removal should be included as part of the works. Demolition of the existing 15 kennels to allow for the construction of 13 new kennels. The footprint of the building cannot be increased; therefore, the total number of kennels is to be reduced to increase the size of 5 kennels to accommodate the large breed dogs. A detached, double quarantine kennel is to be constructed to replace the freestanding timber kennel which currently sits on the concrete slab. Some remedial works may be required to the concrete slab. The kennels will be a basic construction comprising concrete block with composite, insulated roof panels. An internal hatch will separate the run from the sleeping area which can be closed off using a mechanical pulley operated both internally and externally. A new dog wash is to be constructed with access gained from a new corridor and door opening within the attached building. An ecology survey has identified roosting bats to the flat roof of the main building. Therefore, the flat roof is to receive ad-hoc bitumen repairs.

Katy Reed

Published 1 day ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline cancelled

Publish
Bid
Evaluate
Award
Complete