Upper Thurne Construction Works - Package 2

Open

Buyers

Value

£20,000,000

Classifications

  • Works related to water-distribution pipelines
  • Pumping station construction work
  • Construction work for water projects
  • Water-treatment plant construction work
  • Electrical installation work
  • Mechanical engineering installation works
  • Engineering design services

Tags

  • tender

Submission Deadline

2 months from now

Published

8 hours ago

Description

This procurement covers the design and construction of 3 x pumping stations, namely Martham pumping station, Potter Heigham pumping station and Brograve pumping station.  It also allows for the optionality of adding one additional similar pumping station site namely Somerton South Pumping Station and Culvert or Repps pumping station at a future date. Each of these sites has an existing pumping station which will need to be decommissioned.  Any instruction for one of the two optional sites is expected to be within 12 months of the Contract Date.
The value is estimated at £8-£12million for the initial 3 sites with up to a further £6million for the fourth site depending on works required.  These figures are exclusive of VAT.  These works are to be funded from Environment Agency Grant in Aid. 
The works and its objectives are entirely consistent to ensure compliance with the BIDB statutory duties as a Section 28g body under the Wildlife and Countryside Act 1981 (as amended).
The scope of the works:
	Design and construction for the 3 pumping stations.  Design is limited to the following design tasks (Refer Section S300 of the Scope)
	Telemetry system
	External lighting 
	Control kiosk including HVAC 
	Motor Control Centre and full electrical system design including Functional Design Specification
	Stop log systems and non return / control valves
	Ducting and draw pit numbers and dimensions
	Precast Concrete Units 
	MCC support frame
	Temporary works including relevant licences, permissions and consents
	Associated civil, mechanical and electrical works
	Integration with existing water infrastructure
	Testing, commissioning and handover to operations
	Sectional Completion
	Decommissioning of existing 3 pumping stations
	Potential for all of the above for 4th site.
Bidders that express interest following the publication of this Tender Notice will be invited to attend an accompanied group visit incorporating Martham, Potter Heigham and Brograve.   Two dates will be available (as detailed below), and each bidder is required to attend only one of these sessions.  Attendance will be limited to one vehicle and a maximum of 2 representatives per organisation. The vehicle must be a 4x4 to enable access to these sites:
Tuesday 25th November 2025
Wednesday 26th November 2025
All questions and answers raised during the 2 site visit days will be documented and shared with all Tenderers via the eTender portal.
The Water Management Alliance (WMA) will oversee this procurement on behalf of the Broads Internal Drainage Board working with Turner & Townsend as advisors.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Design, Build, Install and Maintenance Contract for Halton Microgrid

BACKGROUND INFORMATION Halton Borough Council (HBC) is a Unitary Authority based in Cheshire, North West England, comprising the main towns of Runcorn and Widnes. The Council declared a Climate Emergency on the 16th October 2019. Following the declaration, the Council developed an Action Plan which is predominantly focused on reducing the Council's own carbon production. The Council has developed a number of rooftop solar PV schemes and a 1.2MWp solar farm. Whilst these projects have been invaluable, it became apparent to the Council that larger interventions would also be required in order to meet the Council's 2040 net zero target. With this in mind, the Council commissioned a feasibility study in early 2020 to evaluate the potential to construct a solar farm on Council owned wasteland. The study concluded that the potential existed to construct a 3.62MWp solar farm on a closed landfill site located immediately north of Ditton Rd in Widnes (postcode WA8 0PG - Coordinates E: 350056, N: 385004). The site was historically used as a chemical waste landfill site, before being converted to a municipal golf course (St Michael's Golf Course). The course was subsequently closed, and the site has been unused since. The Council are now planning to construct a 3.62MWp solar farm at the closed landfill site, which will be connected to the existing 1.2MWp solar farm via a new 11kV link. The resulting 5.2MWp of solar PV generation will provide power to a number of council owned facilities in Widnes town via an extensive 11kV ring main which is to be installed as part of the project. The scheme will also incorporate a 2MW/4MWh battery storage scheme and a high-power electric vehicle charging hub at the Council's Lower House Lane transport depot. On 1st June 2021 the Council secured a 6.1MVA export and 5.0MVA import grid connection offer from the local DNO (SP Energy Networks). On 27th June 2024, the Council submitted a planning application for the project, and the application was approved on 23rd January 2025. During 2024, the Council has negotiated the necessary agreements to obtain construction access to the site. The Council own the land on which the scheme is to be built, all of the buildings, and will own the Microgrid once it is commissioned and handed over. The Council are now seeking EPC (Engineer Procure and Construct) proposals for the turn-key detailed design, installation and commissioning of the Smart Microgrid Project, which will encompass the following key components; (a) A 3.62MWp solar farm, including all associated building and civil engineering works. (b) An 11kV link between the existing 1.2MWp solar farm and the new 3.62MWp solar farm. (c) A 2MW/4MWh battery storage system at the new solar farm site. (d) An 11kV link from the new solar farm substation to a new Intake Substation located at the Council's Lower House Lane depot, including an associated horizontal drill under a major A Road. (e) A new 33kV / 11kV Intake Substation (ISS) at the Council's Lower House Lane Depot. (f) New 11kV distribution substation infrastructure at four Council sites (Halton Stadium, Halton Leisure Centre, Municipal Offices and Lower House Lane Transport Depot) (g) A buried HV ring connecting the new Intake Substation (ISS) with the four distribution substations. (h) High power EV and eRCV charging infrastructure at the Lower House Lane transport depot. (i) A SCADA control system to enable the efficient and optimal management of the completed microgrid system and the associated generation and storage assets. The Tenderer's scope will include all works required to deliver a fully compliant, safe, efficient and working installation. Following completion of the construction works. The EPC Tenderer shall be responsible for providing EPC warranty and O&M (Operations and Maintenance) services for a minimum period of two years, with options for multiple contract extensions.

Katy Reed

Published 1 day ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline active

Publish
Bid
Evaluate
Award
Complete