New Build Development Works & Associated Drainage, Infrastructure & Highways Works at Tudor Inn, Cimla, Neath

Open

Value

£5,500,000

Classifications

  • Construction work for multi-dwelling buildings and individual houses
  • Houses construction work
  • Multi-dwelling buildings construction work
  • Residential homes construction work
  • Building completion work
  • Building demolition and wrecking work and earthmoving work

Tags

  • tender

Submission Deadline

1 month from now

Published

3 days ago

Description

Tai Tarian is seeking to award a Contract for New Build Development Works & Associated Drainage, Infrastructure & Highways Works at Tudor Inn, Cimla, Neath, including managing demolition within an occupied area, to support Tai Tarian in the delivery of its development programme.
The work comprises of the demolition of 2 existing properties to form access for the construction of 12 houses and 10 apartments and associated external works, drainage and incoming services.
Tenderers should note that a site visit may be made at any time.  Tenderers are responsible for obtaining any further information including inspection of the site (and will have deemed to have done so) to ensure sufficiency of your Tender.
Tenderers must complete the Contract Sum Analysis (Appendix 2 – Contract Sum Analysis) in the format provided. A breakdown of the external works costs and preliminaries is also required.
Collateral warranties will be required from all designers and will only be accepted in the format contained in Appendix 1 – Contract Documentation.
Tenderers are reminded that it is expected that the Tenderers proposals will mirror the Employers Requirements. Any alterations must be clearly identified.
A S104 Agreement will be required for the scheme. All costs associated with obtaining this agreement will be borne by the Contractor and should be included within the tender sum. For the avoidance of any doubt, this should include all legal fees, surety costs and commuted sums.
It is anticipated that a S278 Agreement will be required for the scheme. All costs associated with obtaining this agreement will be borne by the Contractor and should be included within the tender sum. For the avoidance of any doubt, this should include all legal fees, surety costs and commuted sums.
The client has commenced with the SAB application, and it is hoped that this will be in place prior to signing of contracts. All costs associated with obtaining this agreement will be borne by the Contractor and should be included within the tender sum. For the avoidance of any doubt, this should include all legal fees but can exclude any surety costs or commuted sums.
Tenderers should note that the specification documents must be complied with fully and no deviation from the listed items will be accepted, unless agreed with Tai Tarian prior to installation.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

[email protected]

+44 1639505890

+44 2079477501

Timeline active

Publish
Bid
Evaluate
Award
Complete