Traction Power & Earthing Upgrades - Phase 1 Works

Open

Value

£750,000

Classifications

  • Construction work

Tags

  • tender

Submission Deadline

1 week from now

Published

1 month ago

Description

TfGM is looking to establish a contract to ascertain current asset condition information & outline design (Phase 1).

The current traction return system in the City Centre is already a floating system following the opening of 2nd City Crossing (2CC) in 2017.  When the negative return system is floating, protective measures must be in place to protect persons against the risk of electric shock from dangerous voltages (touch or accessible voltages) between the rails and metallic objects or earth within the Overhead Contact Line Zone (OCLZ). At present there are a number of assets (exact extents unknown) which are located within the OCLZ within 1CC that were not electrically bonded when the system was "floated" in 2017. All existing 1CC line-side assets, that fall within the OCLZ, must be assessed against relevant standards and the Metrolink Infrastructure Technical Specification System Earthing Policy to ensure compliance and any identified non-compliances rectified on site. 

PIN  2023/S 000-034915

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline active

Publish
Bid
Evaluate
Award
Complete